Cloverdale Road, Fairview Avenue to Ustick Road

General Description

  • Widen roadway to five lanes with curb, gutter and sidewalk, using existing sidewalk where feasible
  • Add bike lanes
  • Install two pedestrian signals on Cloverdale Road at Granger Street and S. Clover Meadows Drive
  • Build a retaining wall on east side of roadway, between Stillwater Drive and Bowmont Street

Project also includes

  • A drainage pond near the south property line of the Cloverdale Nursery
  • Work at Fairview Avenue and Cloverdale Road intersection to smooth out rough surface

October 24, 2013 Open House

Click on the following image to view displays from the open house:

CloverUstickFair.gif

Aerial.gif

 Where did this project come from?

This project originated from the Cloverdale Concept Design that was adopted by the ACHD Commission in 2011. Click here for more information.

 

Time Frame

Start Date: Construction currently scheduled for 2018
End Date: TBD