Orchard Street Greenbelt Connection (Kuna)

General Description

This project is substantially complete as of 11/09/16.  

Orchard Street Greenbelt Connection

  • Provide pedestrian and bicycle access to greenbelt extension via proposed¬†pedestrian facilities¬†in the Orchard Street right-of-way.
  • Install pedestrian ramps on south side of the Avalon and Orchard intersection.
  • Construct curb, gutter, and attached sidewalk on the west side of Orchard Street starting at Avalon and extending south to end of existing pavement.
  • From existing pavement, south to future greenbelt pathway construct a detatched asphalt pathway within ACHD's right-of-way.

Schedule

  • Design 2014/2015
  • Right-of-way 2015
  • Construction 2015

Time Frame

Start Date: Construction scheduled for 2015
End Date: TBD