Ada County Highway District

Ustick Road and Linder Road Intersection

General Description:

Construction work to begin on Creason and Coleman Laterals

As part of the Ustick Road and Linder Road Intersection Project, work on the Creason and Coleman Laterals is expected to begin the week of January 12, 2009. The lateral work is being completed during the non-irrigation season when minimal water is in the laterals.

 

The Laterals

The laterals are irrigation channels that deliver water to downstream users, generally between March 15th and October 15th.

 

Lateral Work

The Creason Lateral will be relocated to make room for the new intersection; the Coleman Lateral will be replaced and extended to accommodate an asphalt pathway at the school.

 

Intersection Reconstruction

After constructing the lateral crossings this winter, intersection construction will begin early summer 2009 and every effort will be made to have construction completed by the time school starts in the fall. Utility relocations are expected to occur in the spring or early summer 2009.

Between completion of the lateral work and beginning of the intersection reconstruction, temporary asphalt will be put down. Permanent asphalt will be applied when the intersection reconstruction is completed.

 

Construction Details - Lateral Work Only

Construction on the laterals will be limited to daytime hours between 7 a.m. and 7 p.m. No night work is anticipated. Motorists can expect lane restrictions, with flaggers, as well as short term road closures required to complete the lateral work (please note that when the intersection reconstruction begins, there will be longer delays). The contractor, Brown Construction, will post notices of closures a week in advance.

For a map of the project, please see the January 2009 Newsletter to the right under "Related Documents".

 

Project Description

  • Reconstruct and widen intersection to include left and right turn lanes and two through lanes in each direction on each leg.
  • Install a traffic signal.
  • Widen existing bridge on Ustick Rd.
  • Add curb, gutter, sidewalk and bike lanes within project limits.
  • Add a temporary asphalt sidewalk on the east side of Linder Rd. between Sawtooth Middle School and the project limits.
  • Construct a stormwater detention pond on the north side of Ustick Rd., west of the intersection.

 

Time Frame

Start Date:
2009
End Date:
TBD