2018 Arterial and Collector Capital Maintenance

Construction update as of 4/20/18:  The Preconstruction Meeting is scheduled for April 24th. The Notice to Proceed is May 2nd.

General Description:
Road resurfacing work is planned for the following roadway segments:

  • Black Cat Road from Kuna Road to Lake Hazel Road
  • Black Cat Road from Amity Road to Victory Road
  • Ten Mile Road from Deer Flat Road to Lake Hazel Road
  • Franklin Road from Beechwood Drive to Orchard Street
  • Orchard Street from Franklin Road to Emerald Street

Many pedestrian ramps will be replaced and upgraded to comply with the Americans with Disabilities Act (ADA) standards. This will include the removal and replacement of concrete and impacts to sidewalk.

Franklin Road will be reduced to one lane on the south side of the road for ten days to accommodate pedestrian and bicycle traffic during construction on that section of roadway. On weekdays, work is permitted from 9 a.m. to 4 p.m. and 6 p.m. to 10 p.m. Weekend work is possible between 7 a.m. and 10 p.m.

Time Frame
Start Date: May 2018
End Date:  Fall 2018

Return to Projects

Related Documents

Project Manager


We Drive Quality Transportation For All Ada County ~
Anytime...Anywhere

Ada County Highway District © 2017
For Questions or problems with this Web site contact the Webmaster