Construction Update as of 10/4/19:

Asphalt paving on Linder Road between McMillan and Chinden is complete. Minor work remains, including concrete sidewalk and landscape repair.

Storm drain installation between McMillan and Chinden is complete. Crews are working on placement of base gravels and preparing for concrete curb, gutter, and sidewalk.

There may be one lane in each direction near the Fire Station starting as early as July 29th to allow for pipe installation.This work is expected to be complete by August 9th.

Most of the widening between McMillan and Chinden is scheduled to be done August to October.

Starting June 20th to August 16th, Linder Road between Ustick Road and McMillan Road will be closed. The road closure is intended to allow crews to finish the roadway improvements on Linder Road between Ustick and McMillan before the next school year begins.

Crews are currently working on Linder Road, Ustick to McMillan. Most of the widening between McMillan and Chinden is scheduled to be done August to October.

Construction began the week of February 18th. This project is being built in conjunction with the Linder, Ustick to McMillan project.

About the Project:

At the end of February construction will begin on the Linder Road, Ustick to Chinden projects. When complete Linder Road will feature:

  • Two lanes in each direction, with a center turn lane
  • Bike lanes
  • Curb, gutter and sidewalk
  • Signalized pedestrian crossings at Monument Street and at the Meridian Fire Station
  • Learn more about the segment between Ustick and McMillan roads.

Construction Impacts
Impacts could include lane restrictions with flaggers, temporary closures, general construction noise, dust, equipment back up alarms, and ground vibration.

Other Upcoming Construction Projects

Over the next several years this area will have several local and state roadway/intersection projects under construction by ACHD, as well as the Idaho Transportation Department (ITD). Check out this construction map to view upcoming projects and anticipated construction years.

............

General Description:

  • Widen roadway to include two travel lanes in each direction and a center turn lane.
  • Construct curb, gutter and separated sidewalk to match existing on east side of the road.
  • Add pedestrian signal and crosswalk on Linder at Meridian Fire Station.
  • Add bike lanes on both sides.

Project Purpose

  • Improve safety for motorists, pedestrians and bicyclists.
  • Accommodate existing and future traffic volumes.

Information about this short segment of Linder Road was available for the public to review at the public open house for the Linder Road, Ustick Road to McMillan Road project on May 1, 2017. If you missed that open house, the information about this project can be found under "Related Documents".

Design:
2017
Right-of-Way:
2017
Construction:
2020