Project considered substantially complete.
Traffic Information: Traffic is one lane in each direction on Linder Road. There may be daytime lane restrictions with flagging. Crews are working on the traffic signal at the Franklin intersection, this may require the intersection to be placed in temporary flashing operations with flaggers.
A preconstruction conference was held on January 20th.
General Description:
The Ada County Highway District will widen Linder Road to five lanes with curb, gutter, sidewalk, storm drain, and bike lanes. The project includes upgrading the Union Pacific Railroad crossing, irrigation crossings, and Bridge #131. This project is a top priority Safe Routes to School request from the West Ada School District.
Design: 2017
Right of Way: 2018
Construction: 2020